Home About us Products Case shows Services News Message board Careers Contact us
Position:Home > News > 8×104m3/d Natural Gas Liquefaction plant Contract Has been Signed
8×104m3/d Natural Gas Liquefaction plant Contract Has been Signed
发布时间:2009-04-21 点击次数:278

A contract of 8×104m3/d  natural gas liquefaction plant is signed on 20 October 2008 in Chengdu. This plant is invested by China Petro Zhongtai Natural Gases Co. Ltd. and located in Liling, Hunan Province. Chengdu Air is in charge of the design of process flow and supplement of equipments. This plant is supposed to operate in October, 2009.

 
上一篇新闻:20×104m3/d Nat 下一篇新闻:20×104m3/d Nat
成都深冷空分设备工程有限公司 E-mail:cdkf@chengduair.com
地址:成都市郫县成都现代工业港北区港北四路335号 电话(Tel):028-87893658 传真(Fax):028-87893650 邮编:611743
Copyright 成都深冷 2009 All Right Reserved 您是本站第 [4534] 位访问者