Home About us Products Case shows Services News Message board Careers Contact us
Position:Home > News > The first set of Chinese CBM liquefaction plant has been put into operation successfully
The first set of Chinese CBM liquefaction plant has been put into operation successfully
发布时间:2009-04-21 点击次数:330

Shanxi Towngas CBM liquefaction plant is joint  invested  by Hong Kong  Towngas and Shanxi Jinmei Group . The liquefaction capacity is  25 × 104Nm3 / d. Chengdu Air is in charge of the design of process packets,  supplement of equipments  equipment and management of site construction.
The coal bed gas liquefaction plant started the commission from November 21, 2008 ,  all performance parameters met and over the design specifications. The smooth commissioning of this plant must be credited to the sincere cooperation between Hong Kong  China Gases  and Chengdu Air,  This plant has achieved the following domestic first:
·The first coal bed gas liquefaction plant and all devices are fabricated domestically;
·The first low power consumption , mixed refrigeration process (MRC) with fully independent intellectual property ;

·The first shortest commissioning period  of MRC refrigeration technology used in natural gas / coal-bed methane liquefaction plant;
·The first LNG / LCBM devices that has been conducted Hazard and Operability Analysis (HAZOP);
·The first storage LNG / LCBM tank (4500m3) with inner pressure near to normal atmosphere.

 

 
上一篇新闻:Chengdu cryogen 下一篇新闻:TThe first set
成都深冷空分设备工程有限公司 E-mail:cdkf@chengduair.com
地址:成都市郫县成都现代工业港北区港北四路335号 电话(Tel):028-87893658 传真(Fax):028-87893650 邮编:611743
Copyright 成都深冷 2009 All Right Reserved 您是本站第 [4535] 位访问者